Estimating , Costing & Valuation Syllabus — Unit-wise Content
The official GTU curriculum for Estimating , Costing & Valuation (subject code 3350604) as prescribed for Electronics · Semester 5 divides the course into 5 units, covering 25 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (3350604)Unit 1 Estimation and Modes of Measurem ent
- 1.2. Types of estimate and Data required
- 1.3. Overhead charges, contingencies, water charges, provisional sum, prime cost, provisional quantities, spot items, day work.
- 1.4. General rules for the measurements and its units of different items of civil engineering work.
- 1.5. Quality and duties of good estimator
Unit 2 Specificati ons of Civil Works
- 2.1. Importance specification
- 2.2. Types of specification
- 2.3. Principle of writing specification
- 2.4. Specification of Earthwork in Excavation, cement concrete, Brick masonary, R.C.C. Work, Plastering Work, Painting, Flooring
Unit 3 Rate Analysis of Civil Works
- 3.1. Task Work and Factors affecting it
- 3.2. Labour required for different works and Labour rates
- 3.3. Market rates of construction materials
- 3.4. Schedule of Rates (SOR)
- 3.5. Rate analysis and factors affecting it rate analysis
- 3.6. Rate analysis for earthwork in excavation, C.C.Work, Brick masonry Work, R.C.C. Work, Plastering, flooring work. Estimating , Costing & Valuation Course Code: 3350604 GTU/ NITTTR Bhopal/14-15 Gujarat State 3 Unit Major Learning Outcomes (Major outcomes in cognitive domain) Topics and Sub-topics
Unit 4 Estimation of Civil Works
- 4.1. Methods of detailed estimation
- 4.2. One/ two room building
- 4.3. Two storied buildings (RCC footings, Column, beams, slab)
- 4.4. RCC retaining wall/ Culverts
- 4.5. Methods of calculating earthwork quantities for roads and canals
Unit 5 Valuation of Civil Engineerin g projects
- 5.1. Cost, Price and Value
- 5.2. Types of property and Objects of valuation
- 5.3. Depreciation and Obsolescence
- 5.4. Different forms of Value
- 5.5. Valuation tables and Valuation methods for property and land
- 5.6. Types of rents and fixing standard rents