Production Planning in Textiles
Get the full GTU study material, English & Gujarati textbook PDFs, syllabus curriculum, and solved previous year question papers.
English Book & Chapters
English Book Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesGTU Previous Year Papers
Papers Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesProduction Planning in Textiles Syllabus — Unit-wise Content
The official GTU curriculum for Production Planning in Textiles (subject code DI04029021) as prescribed for ICT · Semester 4 divides the course into 4 units, covering 21 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (DI04029021)Unit 1 1.1 Computation of count, length and weight of yarn in both direct and
- indirect system. 1.2 Average count and resultant count in both direct and indirect system. 1.3 Different count system and their Relation. a) Tax Count. b) Denier Count. c) English Cotton Count Ne. d) Matric Count Nm
Unit 2 2.1 Production efficiency, hank of lap, weight of lap, length of lap, time
- required to prepare lap, draft between C R and L R for Blow room. 2.2 Production efficiency
- hank of sliver
- cleaning efficiency
- time required to exhaust and fill up can from given data for carding machine
- draw frame machine. comber machine
- speed frame
- ring frame
- two for one twister 2.3 Production efficiency
- time required to prepare one cone
- time required to exhaust one ring bobbin for winding machine
- warping machine
- sizing Machine 2.4 production of loom
- waste of warp
- waste of weft
Unit 3 3.1 Weight of warp, weight of weft, GSM, Heald count, Reed count for
- give data. 3.2 Contraction of warp
- cover factor for warp
- weft, max
- EPI and PPI for given data
Unit 4 4.1 Gearing calculation
- 4.2 Calculation of draft from gearing
- from hank fed and hank delivered