Mine Surveying II
Get the full GTU study material, English & Gujarati textbook PDFs, syllabus curriculum, and solved previous year question papers.
English Book & Chapters
English Book Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesGTU Previous Year Papers
Papers Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesMine Surveying II Syllabus — Unit-wise Content
The official GTU curriculum for Mine Surveying II (subject code DI04022011) as prescribed for CSE · Semester 4 divides the course into 6 units, covering 15 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (DI04022011)Unit 1 Basics of Total Station
- 1.1 Introduction to Electromagnetic Distance Measurement (EDM) 1.2 Introduction to Total Station 1.2.1 Application of Total station in Mining 1.2.2 Parts of Total Station (TS) 1.2.3 Set up of Total station over a survey station 1.2.4 Measurements: Horizontal and Slope distance
- Horizontal angle, and Vertical angle
- Elevation 1.2.5 Precautions to be taken while using Total Station 1.2.6 Merits of total station 1.2.7 Drawback of Total station
Unit 2 Triangulation
- 2.1 Basic concept of Triangulation survey 2.2 Classification of triangulation survey/system 2.3 Triangulation figures 2.4 Well-conditioned triangle 2.5 Application of Sine rule 2.6 Routine of triangulation survey: 2.7 Reconnaissance
- Erection of signals and towers
- Measurement of base line and its extension & Azimuth of Base line
- Satellite station
- Measurement of horizontal angles
Unit 3 Basics Photogrammetry
- 3.1 Introduction 3.2 Classification of photogrammetry 3.3 Application of photogrammetry in mining Program Name: Diploma Engineering Level: Diploma Branch: Mining Engineering Subject Code: DI04022011 Subject Name: Mine Surveying II 3.4 Terrestrial photogrammetry 3.4.1 Definition 3.4.2 Principle 3.4.3 Merits and Demerits 3.5 Aerial Photogrammetry 3.5.1 Definition 3.5.2 Principle 3.5.3 Merits and Demerits
Unit 4 Tacheometric Survey
- 4.1 Basic concept of tacheometric surveying 4.2 Instruments: Tacheometer
- Levelling staff, and Stadia Rod 4.3 Anallatic lens 4.4 Methods of Tacheometry 4.5 Determination of Tachometric constants with problem and solution 4.6 Field work
- Errors, and precision
Unit 5 Correlation
- 5.1 Introduction 5.2 Purpose of Correlation of survey 5.3 Classification of Correlation survey 5.4 Direct traversing through Adit or Incline 5.5 Correlation by Two wire in a single Shaft 5.5.1 Shaft Plumbing for correlation 5.5.2 Method: 5.5.2.1 Coplaning method 5.5.2.2 Weisbach Triangle method 5.5.2.3 Weiss Quadrilateral Method 5.6 Correlation of mine survey to the National Grid
Unit 6 Underground Survey
- 6.1 Curve: Definition and Classification of Circular curves: Simple
- Reverse 6.2 Elements of a simple circular curve 6.3 Procedure of maintaining direction and gradient of Drivage 6.4 Measurement of distance and difference in elevation 6.5 Stope Surveying: Introduction and Purpose of stope surveying