Instrumentation Project Management
Get the full GTU study material, English & Gujarati textbook PDFs, syllabus curriculum, and solved previous year question papers.
English Book & Chapters
English Book Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesGTU Previous Year Papers
Papers Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesInstrumentation Project Management Syllabus โ Unit-wise Content
The official GTU curriculum for Instrumentation Project Management (subject code BE05000101) as prescribed for EIE ยท Semester 5 divides the course into 7 units, covering 92 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (BE05000101)Unit 1 Introduction to project management Definition of project purpose -
- quality and organization structure
- Basic and detailed engineering: Degree of automation
- Project S curves
- manpower considerations
- inter-department and inter-organization interactions
- Multi agency interaction
- Types of projects and types of contracts e.g
- EPC, BOOT etc
- Risk Management in Instrumentation Projects
- EPCM Contracting model
Unit 2 Project management functions Controlling, directing, project authority,
- interpersonal influences and standard communication formats
- project reviews. project planning and scheduling
- life project engineering and management cycle phases
- the statement of work (SOW)
- projects specifications
- bar charts
- work breakdown structures
- cost breakdown structures and planning cycle
- Agile Learning
- Risk Based Scheduling
- Stakeholder & communication
Unit 3 Project cost and estimation Types and estimates, pricing process, salary
- and other overheads
- materials and support costs. program evaluation and review techniques (PERT) and critical path method (CPM)
- estimating activity time and total program time
- total PERT/CPM planning crash times
- software used in project management
Unit 4 Instrument Project Control Project engineering documents and
- drawing: Process flow sheets
- Mechanical flow sheets
- Instrument index sheets
- loop wiring diagram
- panel drawings and specifications
- plot plans
- installation details
- special drawings
- purchase requisition
- other documents
- Information required: Process information
- Instrument specifications and standards
- Electrical specifications
- bid documents
- Project procedure
- project schedule
- Equipment Information
- Vendor drawing Work coordination: Project manager
- process engineer
- equipment engineer
- purchasing and expediting and others Planning hints and Project check list
- Document control System (EDMS)
- Engineering Documentation (C&E
- Control Narratives, FBD, Ladder Logic)
- Loop-wise Detailing (AI, AO, DI, DO, Termination) Hook-up Diagrams & BOM FAT/SAT
Unit 5 Engineering Design criteria Pneumatic versus electronics system, 10 25
- Program Name: Bachelor of Engineering Level: UG Branch: Instrumentation and Control Subject Code : BE050000101 Subject Name : Instrumentation Project Management Control centers
- Future and spare capacity Specifications for various measurement and control groups: Flow
- Control valves
- Control panels
- Analytical instruments Transmission systems: Pneumatic & Electronic โ Materials
- Terminations and Identification Process connections โ Take-offs and Piping
- Location of taps
- Sealing instruments from process
- Manifolds and gage valves Miscellaneous Design Criteria: Mounting instruments
- Selections of units
- Instrument identification
- Material of construction
- Package equipment systems Electrical safety: NEC code
- Purging and pressurization
- Intrinsic safety
- EPC Projects - Power Plant
- Oil and Gas, Wastewater treatment
- dairy and food
- pharmaceuticals and chemical plants
- Functional Safety (SIL
- Process Safety Management (PSM) & MOC, Modern safety standards (OSHA
Unit 6 Construction and Start up Organizing
- cost control Ordering and Receiving equipment and Material: Purchase orders
- Material status
- storage Installing instrument systems: Procedures
- Good installation practices Calibration Testing: Process connections
- Pneumatic lines
- Electrical Loop checking: Flow transmitter
- Temperature transmitter
- Control valve
- Miscellaneous checks Startup: Placing instruments in service
- Tuning loop controls
- evaluating process upsets and disturbances
- Repairing or replacing defective equipment
- special equipment
- Construction Safety Practices (PTW
- confined space
- work at height)
Unit 7 Introduction to International quality systems - ISO 9000 Quality
- management practices worldwide
- certifying agencies
- customers and ISO 9000 ISO 9000
- IEI and Test standards and Calibration