Quantity Survey And Costing
Get the full GTU study material, English & Gujarati textbook PDFs, syllabus curriculum, and solved previous year question papers.
English Book & Chapters
English Book Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesGTU Previous Year Papers
Quantity Survey And Costing Syllabus — Unit-wise Content
The official GTU curriculum for Quantity Survey And Costing (subject code 3356003) as prescribed for TE · Semester 5 divides the course into 5 units, covering 10 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (3356003)Unit 1 Modes of Measuremen ts
- 1.1. Types of Estimate: Construction Cost Estimates, Design Estimates, Bid Estimates, Control Estimates, Objects of Estimating,
- 1.2. Data required: Taking out Quantities, Methods
- 1.3. Structures: compound wall, slab, slab culvert, pipe culvert, earthwork for road, W.B.M. road with bitumen carpet, concrete road, R.C.C. retaining wall and roof truss
- 1.4. Units: types, general rules, mode of measurement of different items, measurement units, accuracy
Unit 2 Detailed Estimate
- 3.1. Structure: Detailed estimate of compound wall, slab, slab culvert, pipe culvert, earthwork for road, W.B.M. road with bitumen carpet, concrete road, R.C.C. retaining wall and roof truss
Unit 3 Specifications
- 3.1. Detailed specifications for different types of different masonry, Earthwork, road
Unit 4 Rate analyses
- 4.1. RA, S.O.R., Task work
- 4.2. Derive R.A. for different types of stone masonry, road, culverts Quantity Survey and Costing Course Code3356003 GTU/ NITTTR Bhopal/14-15 Gujarat 3 Units Major Learning Outcomes (in Cognitive Domain) Topics and Sub-topics
Unit 5 Approximate Estimate
- 5.1. Terminologies related to estimating and work: Day work, Prime cost, Provisional sum, Provisional Quantities, Spot items, Contingencies charges, Work charged establishment charges
- 5.2. Methods of approximate estimate (Plinth area method, Cubical contents methods Unit base method)