Estimation & Costing
Get the full GTU study material, English & Gujarati textbook PDFs, syllabus curriculum, and solved previous year question papers.
English Book & Chapters
English Book Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesGTU Previous Year Papers
Papers Coming Soon
We are working hard to add this material. Stay tuned for updates!
Follow on Instagram for UpdatesEstimation & Costing Syllabus — Unit-wise Content
The official GTU curriculum for Estimation & Costing (subject code DI04006021) as prescribed for Electronics · Semester 4 divides the course into 5 units, covering 64 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (DI04006021)Unit 1 Fundamentals of Estimating and Costing
- 1.1 Estimating and Costing- Meaning
- Administrative approval
- Technical Sanction and Budget provision. 1.2 Classification of estimates- Approximate and Detailed estimate. 1.3 Types and Uses of Estimates: Revised estimate
- Supplementary estimate
- Repair and maintenance estimate
- renovation estimate. 1.4 Approximate estimate- Definition
- Purpose. 1.5 Methods of approximate estimate – Service unit method
- Plinth area rate method
- Cubical content method
- Typical bay method
- Approximate quantity method (with simple numericals) 1.6 Approximate estimate for roads
- irrigation projects and water supply projects. 1.7 Roles and responsibility of an Estimator. 1.8 Checklist of items in load bearing and framed structure. 1.9 Standard formats of Measurement sheet
- Abstract sheet
- Face sheet. 1.10 Modes of measurement and desired accuracy in measurements for different items of work as per IS: 1200 – Earthwork
- Concrete work
- Stone work
- Roof work
- Floor work
- Doors and windows
- Wood work
- Streel work
- Whitewashing and distempering
- etc. 1.11 Rules for deduction in different category of work as per IS: 1200 – Opening for masonry work
- Deduction for lintels over openings Deduction for plastering
Unit 2 Specifications of civil engineering works
- 2.1 Importance and types specification 2.2 Principles of writing specification 2.3 Description / specification of items of building work as per PWD/R&B – Earthwork
- Concrete work
- Stone work
- Roof work
- Floor work
- Doors and windows
- Wood work
- Streel work
- Whitewashing and distempering
- Painting, etc
- Program Name: Diploma Engineering Level: Diploma Branch: Civil Engineering Subject Code : DI04006021 Subject Name: Estimation & Costing
Unit 3 Detailed Estimate
- 3.1 Detailed Estimate – Definition and Purpose
- Data required for detailed estimate- Civil cost, GST, Contingencies
- Supervision charges
- Agency charges
- Procedure for preparation of detailed estimate- Taking out quantities and Abstracting. 3.2 Methods of Detailed Estimate- Unit quantity method and total quantity method (with simple numericals) 3.3 Longwall and Short wall method
- Centre line method. 3.4 Bar bending schedule for footing
- chajja and slab elements 3.5 Provisions in detailed estimate: contingencies
- work charged establishment
- percentage charges
- water supply and sanitary Charges and electrification charges etc. 3.6 Prime cost
- Provisional sum, Provisional quantities
- Bill of quantities
- Spot items or Site items
Unit 4 Estimate for Civil Engineering Works
- 4.1 Earthwork- Quantities for roads
- Embankment and canal by- Mid sectional area method
- mean sectional area method
- Prismoidal and trapezoidal formula method. 4.2 Detailed estimate for septic tank
- Community well. 4.3 Use of computer / softwares / programmes for detailed estimate Preparation of Civil Engineering Works
Unit 5 Rate Analysis
- 5.1 Rate Analysis: Definition
- purpose and importance. 5.2 Lead (Standard and Extra)
- overhead charges
- water charges and contractors' profit
- 5.3 Procedure for rate analysis 5.4 Task work- Definition
- Task work of different skilled labour for different items. 5.5 Categories of labours
- their daily wages
- types and number of labours for different items of work. 5.6 Transportation charges of materials- Lead and Lift
- Hire charges of machineries and equipments. 5.7 Preparing rate analysis of different items of work pertaining to buildings and roads considering sustainable materials – Earth work
- Concrete work
- RCC work and First class brick work