Follow on Instagram for UpdatesSubstation Engineering Syllabus — Unit-wise Content
The official GTU curriculum for Substation Engineering (subject code DI04009011) as prescribed for EC · Semester 4 divides the course into 8 units, covering 81 listed topics. The unit-wise breakdown below is read from the GTU syllabus document for this subject code, so you can check what the course actually covers before deciding which papers to attempt.
Download the official syllabus PDF (DI04009011)Unit 1 Introduction to Electrical Substations Contents
- Definition and Purpose of Substations: Overview of substations as critical nodes in power systems Importance in India’s power infrastructure
Unit 2 Types of Substations
- Classification based on function: Transmission
- Switching substation Classification based on voltage level: EHV, HV, MV, LV Indoor vs. outdoor substations
Unit 3 Essential Features of Substations
- Key characteristics: Reliability
- scalability, and maintainability. Basic requirements for substation location (site selection) and accessibility
Unit 4 Typical Layout of Substations
- Overview of substation layout components: Switchyard
- control room, and auxiliary systems. Introduction to single-line diagrams (SLDs) of 66 kV / 132 kV / 220 kV layout. Examples of common layouts (e.g.
- single bus, double Program Name: Diploma Engineering Level: Diploma Branch: Electrical Engineering Subject Code: DI04009011 Subject Name: Substation Engineering bus). 2
- Substation Equipment For all the equipment covered in this unit
- Indian Standards (IS) are for references only and the questions of Unit 2 pertaining to Indian Standards (IS) should be avoided in theory exams
- considering the scope of the syllabus of this subject” Contents: 1
- Transformers (Power Transformers: IS 2026 Part 1 to 4 and Interconnecting Transformers: IS 1180): Requirement of inter-connecting & power transformers Operational and Maintenance checks of transformer Condition monitoring (Parameters – Sensor/Methods – Alarm Threshold) 2
- Isolators (with and without Earthing switch) (IS 9921: Parts 1 to 5) Types and Voltage class: Horizontal and Vertical break / double / centre break
- Manual / motorized
- with/without earthing switch. Pad-locking arrangement
- mechanical and electrical safety interlocking between isolator and earth swich. 3
- Busbars (IS 8084
- IS 5082): Types: strain
- rigid type Material: aluminium pipes
- AAC Ratings: Rated voltage
- material (Copper
- Short time withstand current
- peak withstand current
- temperature rise limits etc. Functions: Switching
- Power transfer /distribution within substation Maintenance: Joint inspections
- corrosion checks. 4
- Auto-Reclosers (IS 7567): Types: Single-phase
- three-phase. Functions: Automatic fault clearing
- circuit restoration. Contact checks
- reclosing mechanism inspection. IoT-enabled fault logging
- remote configuration
Unit 5 Surge Arrestors (IS 3070 Parts 1–3)
- Types: Expulsion type
- Thyrite type
- Metal oxide (MO) conforming IEC 60099-4
- Routine and periodic maintenance procedures Program Name: Diploma Engineering Level: Diploma Branch: Electrical Engineering Subject Code: DI04009011 Subject Name: Substation Engineering
Unit 6 Insulator, strings, Clamps and Connectors, Spacers ((IS
- IS 10162/14763) Insulator Types: Porcelain type (Disc
- long rod)
- Composite type
- Silicon Rubber
- Hollow bushing type
- Bus post insulators Clamps & Connectors: Aluminium alloy casting type A6, bi-metallic liner/strip
- galvanised mild steel. Non-magnetic spacers Routine and periodic maintenance procedures
Unit 7 Power Line Carrier Communication (PLCC) (IS 9149, 4119, 1947, 11538)
- Components of PLCC
- Wave trap Working of PLCC and applications
Unit 8 Batteries and DC Systems
- Introduction to Lead Acid and NiCD batteries Trouble shooting chart for Lead Acid Batteries (Troubles – Symptoms/Cause – Remedies) Maintenance Checks for Lead Acid Batteries Battery Charger -Float and Boost charging 3
- Substation Practices
- Earthing Systems, and Compensation Equipment Contents: 1
- Routine Substation Operations: Switching schemes for 765 KV, 400 KV, 220 KV and 132 KV substations Power flow and voltage level monitoring Documentation and reporting for operational logs Preventive
- Predictive and Proactive maintenance 2
- Earthing Systems (IS 3043): Purpose of earthing systems
- Step & Touch potential
- Transferred & Floating potential Earthing systems in substation: Solidly grounded
- Resistive (NER)
- Grid & Rods
- Counterpoise General recommendation of IS 3043:2018
- IS 5613 (Part 2, Section 1)
- CEA 2010 Regulation (Rule 42) for earthing systems in substations. 3
- Compensation Equipment: Capacitor banks: Introduction
- OUCB – Optimum Utilization of Capacitor Bank
- Case studies 10 22 % Program Name: Diploma Engineering Level: Diploma Branch: Electrical Engineering Subject Code: DI04009011 Subject Name: Substation Engineering for optimal capacitor bank operation
- Commercial benefits of OUCB 4
- Safety Standards and Regulations (IS 5216 Part 1 and 2): General recommendations of IS 5216 Part 1 General recommendations of IS 5216 Part 2 Typical safety clearances based on voltage level (minimum and working safety clearances). Basic safety practices: Personal protective equipment (PPE)
- lockout-tagout procedures 4
- Specialized Substations and Automation Basics Contents: 1
- Gas Insulated Substations (GIS) & Hybrid GIS Substations (HGIS: Overview: Purpose
- use in urban/high-voltage areas
- compactness. Components: Circuit breakers for GIS, Disconnector switches
- non-fault initiating earthing switches
- High speed earthing switches
- three position disconnect / Earthing switches
- View ports, CT, PT, Pressure relief devices
- Density monitors
- Gas pass-through type insulators
- Routine check list of GIS, HGIS substations 2
- HVDC Substations: Overview: Purpose for long-distance/renewable integration. Components: Converters
- DC transformers. Ratings: DC voltage (e.g.
- power capacity (MW). Functions and Maintenance (Efficient power transmission
- grid stability
- Converter valve checks
- filter inspections) Digital monitoring of converter performance. 3
- Substation Automation Basics: Introduction